Warm windows for low-energy and passive-standard projects
A warm window starts with depth. More frame depth means more chambers, more gaskets and room for thick triple glazing. RS Concept, a Polish window and door supplier, delivers deep, made-to-measure systems in three materials: PVC (85 mm, 6 chambers and 3 gaskets in the warmest version), thermally broken aluminium (frame 95 mm, sash 104 mm) and laminated wood (92 mm).
Supply only: installation is done by your own installer or contractor.

Three materials, one principle: depth
- PVC: deep 6-chamber systems with three gaskets and glazing units up to 52 to 54 mm. Lead time from 3 weeks.
- Aluminium: a thermally broken system for energy-focused projects, with glazing up to 71 mm in the frame and 81 mm in the sash. Lead time from 1 month.
- Wood: four layers of laminated timber, 92 mm deep, for projects that want a warm natural look inside. Lead time from 1 month.
Catalogue Uw values
Values from our catalogue, for Ug 0.5:
- PVC, 85 mm deep, 6 chambers: Uw 0.72 W/m²K
- PVC, 120 mm Dutch-style frame: Uw 0.76 W/m²K
- Aluminium, thermally broken, frame 95 mm and sash 104 mm: Uw 0.73 W/m²K
- Alu-clad timber, 74 mm: Uw 0.8 W/m²K
- PVC, 82.5 mm deep, 6 chambers: Uw 0.83 W/m²K
Uw is for the reference window only; actual Uw of another window may differ. The real value depends on size, glazing, spacer and installation, so we state it for your windows in the quote.
The systems in detail
- PVC, 85 mm: 6 chambers, 3 gaskets, glazing up to 52 mm, steel-free profile with the glass bonded to the sash. Lead time from 3 weeks.
- PVC, 82.5 mm: 6 chambers, 3 gaskets, glazing up to 54 mm (bonded) or 52 mm. Lead time from 3 weeks.
- Aluminium, thermally broken: frame 95 mm, sash 104 mm, glazing up to 71 mm in the frame and 81 mm in the sash, triple glazing as standard, sash up to 2900 × 1700 mm. Lead time from 1 month.
- Timber: 92 mm, glazing 46 to 56 mm, four layers of laminated wood and a four-layer coating. Lead time from 1 month.
- Alu-clad timber: 74 mm, glazing up to 48 mm, 3 gaskets. Lead time from 1 month.
The installation detail and an honest note
The window is only half of the result: the installation detail decides whether the numbers hold. We supply without installation, and we state glazing, spacer and technical data for the exact system in your quote.
Honest note: we do not label a window "passive house certified" unless the certificate of that exact system is part of your quote.
Next step
Send your window schedule and the energy target of the project.
See also our overview of windows and doors from Poland.
Frequently asked questions
Is the window passive house certified?
We only call a window passive-house certified if the certificate of that exact system is part of your quote. The figures above are catalogue values for the reference window.
Which Uw will my windows reach?
That depends on size, glazing, spacer and installation. Send the window schedule and the energy target of the project, and we state glazing, spacer and technical data for your windows in the quote.
How long does delivery take?
PVC windows from 3 weeks, aluminium and timber windows from 1 month after the order and final sizes are confirmed. The date is given in your quote.
Do you install the windows?
No, we supply only. Installation is done by your own installer or contractor.
